The Skilled Workers Role in Construction Logistics
Oct 03, 2011 | Blog
It is essential that many of the main individuals working on a site have a stake in the construction logistics plan and understand the flow around the bill of materials
0
Working with the designers to ensure good Construction Logistics
Sep 16, 2011 | Blog
At what point should the flow of materials to a site be discussed? When the site opens? When the first delivery arrives?
0
Stock, Equipment and Material Control in Construction Logistics
Sep 01, 2011 | Blog
Time and materials means money. In this day and age where every penny is a prisoner, construction logistics, as an integral discipline for building projects, is really coming into its own.
0
Applying “Just-In-Time” to Construction Logistics
Aug 10, 2011 | Blog
“Just-In-Time” or JIT, is as it sounds – in construction logistics it is about ensuring that goods, equipments and materials get to site just in time, for ‘immediate’ use or installation. It should, by its very nature, mitigate the two cardinal sins of construction logistics.